Carnegie Library of Pittsburgh

Pittsburgh, PA

Project Details

WNA provided HVAC, Electrical and Plumbing design services for the renovation of the existing two-story branch and a two-story addition. The HVAC system utilized Variable Refrigerant Flow (VRF) technology to provide heating and cooling throughout.
The Electrical system was upgraded to three-phase power while the interior and exterior lighting was upgraded to all LED with digital control. All of the plumbing systems were upgraded to be ADA compliant.

Project Area

8,800 Sq. Ft.

Owner

Carnegie Library

Year Completed

2021

Check Out Our Careers