Carnegie Library of Pittsburgh
Pittsburgh, PA
Project Details
WNA provided HVAC, Electrical and Plumbing design services for the renovation of the existing two-story branch and a two-story addition. The HVAC system utilized Variable Refrigerant Flow (VRF) technology to provide heating and cooling throughout.
The Electrical system was upgraded to three-phase power while the interior and exterior lighting was upgraded to all LED with digital control. All of the plumbing systems were upgraded to be ADA compliant.
Project Area
8,800 Sq. Ft.
Owner
Carnegie Library
Year Completed
2021